BIM modeling
We use modern building information modeling technologies to improve accuracy, reduce risks, optimize costs, and foster productive collaboration among project participants.
Generating input data
- Compilation of technical specifications
- Defining project goals
- Creating the model structure
Creating a conceptual 3D model
- Visualization of the overall concept of the object.
- Development of a three-dimensional design.
- Agreement on basic parameters: dimensions, number of stories, functional areas.
Development of an architectural model
- Detailing of elements: walls, floors, roofs, windows, doors.
- Compiling information on materials and structures.
- Preparation of preliminary drawings based on the model.
Structural Modeling
- Modeling load-bearing structures: columns, beams, slabs, and foundations.
- Calculation of loads and structural stability.
- Coordination with the architectural and engineering teams.
Creating Engineering Models (MEP)
- Modeling of water supply, ventilation, heating, and electrical power systems, etc.
- Coordination of utility systems with architectural designs.
- Automatic clash detection.
Generation of working documentation
- Automatic generation of floor plans, cross-sections, elevations, and specifications.
- Generating cost estimate data based on a model (5D BIM).
- Preparing the model for examination.
Model integration and interdisciplinary coordination
- Integration of architectural, structural, and engineering models.
- Identifying and resolving conflicts between components.
- Coordinating the model across teams.
Delivery of a BIM model for construction
- Preparation of a detailed model for contractors.
- Using the model for work planning, scheduling, and logistics (4D BIM).
- Ensuring the accuracy of construction and installation work.
Analysis and Optimization of Solutions
- Energy efficiency, ventilation, lighting, material intensity.
- Verification of compliance with regulations and standards.
- Optimization of architectural and engineering solutions.
Model Update and Maintenance (As-Built)
- Changes made during construction.
- Creating an “As-Built” model for operations.
- Data Transfer for Facility Management (6D–7D BIM).
-
0
Full cycles of project documentation development
-
0
Prepared technical reports
-
0
Qualified specialists on staff
-
0
Completed turnkey projects
Research institute
Залиште Ваш запит у формі!
Our specialists will promptly provide advice, prepare a proposal, or help resolve a technical issue.